Search query

196 results:
151. Solemn ground-breaking ceremony at the H52-Hochstegen construction lot  
Works are in full swing in all BBT construction lots in Austria; 151 km of the 230 km long tunnel systems have already been excavated, which is nearly two thirds of the entire length. On May 4, 2022...  
152. Important breakthrough for the Brenner Base Tunnel  
With the breakthrough between the Mules and the Isarco River Underpass construction lots, we now have a continuous unbroken tunnel between the southern portal of the BBT and the State border at...  
153. Another decisive step for the Brenner Base Tunnel  
Tender for engineering services for railway equipment launched The Brenner Base Tunnel Society (BBT SE) has tendered the engineering services for the railway equipment in the Brenner Base Tunnel...  
154. Connecting & Protecting: sustainability & the Brenner Base Tunnel  
The Brenner Base Tunnel will make a significant contribution to making passenger and freight transport across the Alps more sustainable, especially over the Brenner Pass. Already during the...  
155. Successful inspection of the TBM "Ida" for the Brenner Base Tunnel  
The official inspection of the second tunnel boring machine (TBM) for the H41 “Sill Gorge-Pfons” construction lot of the Brenner Base Tunnel took place at Herrenknecht AG in Schwanau (D). The...  
156. 100,000 visitors - BBT Tunnel World is still a hot destination!  
Today we reached the record number of 100 000 visitors at the BBT Tunnel World. Martin Schneider, Director of the Tunnel World, and the major of Steinach am Brenner Florian Riedl welcomed a family...  
157. BBT „Connecting and Protecting“ Event – a Family Festival with a Focus on the Environment and Compensation Measures  
This past weekend, BBT SE invited everyone who is interested in the project, especially children this time, to the Tunnel World exhibition centre in Steinach am Brenner. Working with JUFA, the...  
158. H41 Sill Gorge-Pfons: start of tubbing production - how work is progressing while the environment is preserved  
A large part of the tunnel excavation in the H41 Sill Gorge-Pfons construction lot is carried out by means of Tunnel Boring Machines (TBMs). The two TBMs used in this construction lot offer a...  
159. Connecting Europe Days: BBT SE & the European dimension  
What are the Connecting Europe Days? Connecting Europe Days is an event organised by the European Commission on Transport and Mobility, in the light of the important objectives defined in the...  
160. Start of excavations in the BBT lot "H41 Sill Gorge-Pfons”  
Federal Minister Leonore Gewessler sets off the starting volley for one of the largest construction lots in the Austrian part of the project In Ahrental, near Innsbruck, the start of excavation work...