BBT: EU-COMMISSIONER VIOLETA BULC VISITS CONSTRUCTION SITES
07.12.2018 Fortezza / Bolzano - Following the recent breakthrough of the southern portal of the Brenner Base Tunnel,...
07.12.2018 Fortezza / Bolzano - Following the recent breakthrough of the southern portal of the Brenner Base Tunnel,...
04.12.2018 Fortezza/Bolzano – The breakthrough to the southern Brenner Base Tunnel took place yesterday, only a few...
On Saturday, 23rd September BBT SE organizes the yearly Open Tunnel Day River Underpass. Also these year the Open Day...
For the first time ever in the BBT project area of Innsbruck, it was possible to visit the various construction stages...
A new steel bridge re-opens the panoramic trail to walkers