All excavations are now under way in the BBT construction site in Mules
Over 200 kg of explosive dynamite were used Friday 21st April at the BBT construction site in Mules to break out the...
Over 200 kg of explosive dynamite were used Friday 21st April at the BBT construction site in Mules to break out the...
April 18th 2017 was the bid presentation deadline for the largest construction lot for the Brenner Base Tunnel,...
The Minister for Transport of Saxony, Martin Dulig, the Deputy Minister for Transport of the Czech Republic, Kamil...
On the 9th of march BBT SE CEO Dr. Ing. Raffaele Zurlo has officially handed over the new water conducts and related...
Um den Brenner Basistunnel an den Hauptbahnhof Innsbruck anzubinden ist es notwendig, eine dreigleisige Ein- bzw....
BBT SE CEO Dr. Ing. Raffaele Zurlo has officially handed over the new areas for the disposal of recyclable materials to...