Euregio walking stick at BBT Tunnel World
The Euregio walking stick passed through the brand new BBT Infocenter right at the start of its travels to Tyrol.
The Euregio walking stick passed through the brand new BBT Infocenter right at the start of its travels to Tyrol.
After some renovation works, the BBT Infocentre in Steinach am Brenner now offers many new exhibits on display.
A permanent exhibition provides information about the Brenner Base Tunnel and the Munich-Verona railway axis
About one month after construction works started, the excavation works for the first main tunnel below the riverbed of...
In March, tunnel boring machine (TBM) Virginia registered a 860-m excavation record at the Mules construction site
Right at the beginning of the coronavirus crisis, BBT SE immediately took the evolution of the emergency situation very...