The contract for largest construction lot in Austria has been awarded
- The Pfons-Brenner construction lot includes 50 kilometres of tunnel
- The bidding consortium led by PORR made the...
- The Pfons-Brenner construction lot includes 50 kilometres of tunnel
- The bidding consortium led by PORR made the...
The production plant at Hinterrigger, close to the southern end of the exploratory tunnel, has already started up the...
An eminent guest was invited at the BBT Infopoint to relate his discovery, and to bring some light into a topic that is...
The two tunnel boring machines (TBM) for the construction of the main tubes between Mules and Brennero are currently...
Since 2016, the BBT Infocenter in Steinach am Brenner has offered an overview of the largest tunnel project in Europe....
Scegli la tua lingua:
<link...</span>