Guido Tonelli, discoverer of the Higgs boson, guest at BBT
An eminent guest was invited at the BBT Infopoint to relate his discovery, and to bring some light into a topic that is...
An eminent guest was invited at the BBT Infopoint to relate his discovery, and to bring some light into a topic that is...
The two tunnel boring machines (TBM) for the construction of the main tubes between Mules and Brennero are currently...
Since 2016, the BBT Infocenter in Steinach am Brenner has offered an overview of the largest tunnel project in Europe....
Scegli la tua lingua:
<link...</span>
The construction of large infrastructure works such as the Brenner Base (railway) Tunnel are an opportunity that should...
No smoke and no fire either. The extinguisher on a transformer on the Tunnel Boring Machine activated automatically with...