*** SOLD OUT ***

 Unfortunately, registration is no longer possible. All available tickets have already been booked.

Please note that it is not possible to register on site at the event.

All tickets were allocated as part of a prior online registration process.

A unique experience and a fun programme

The "Open Tunnel Day" ist back!

So much more than just a tunnel: come and see what makes the Brenner Base Tunnel special!
We look forward to seeing you at the Open Day on 4 October 2025!
From 9 AM to 5 PM at the BBT Sill Gorge construction site in Innsbruck.

PROGRAMME
Information stands: BBT experts will tell you all about the project
BBT Cinema
Immersive reality show
Games and fun for children (make-up, dancing, magic shows, etc.)
Marquee with catering

HOW TO PARTICIPATE
Given the large number of participants in previous years, in order to ensure everyone's safety and to better manage the large flow of visitors, registration is compulsory this year to participate in the event.

Please show your ticket(s) at the entrance to the event area.
Your ticket is valid in both paper and digital versions.

USEFUL INFORMATION

Sturdy shoes are recommended.
Since the event takes place both in- and outdoors, we recommend that you bring a windbreaker or wear suitable clothing.
The temperature in the tunnel is about 20˚ C.
Prams are not recommended.
Animals are not permitted, except for service dogs which must be leashed and muzzled.

The event will take place in all weather conditions. 

HOW TO REACH THE EVENT VENUE
It is not permitted to drive to the event site in private cars or park in front of the site. 

The event location in the Sill Gorge (Sillschlucht) can be reached by public transport up to the stops mentioned in the information text below. From there, it takes about 20 minutes to walk to the Sill Gorge, with some of the route involving steps.

Public transport connections (city of Innsbruck):
•    tram line 1, with 'Bergisel' stop
•    bus line M or line J, with stop "Tivoli Stadion" / "Freibad Tivoli"

Map: How to reach the Sill Gorge


WHAT IS TO SEE?
Two construction sites, one big event!
In the outdoor area of the Sill Gorge, you can take a closer look at the work completed in 2024 on the Sill Gorge construction site and the north portal of the BBT!

Through a walking route inside the north portal, you can then reach the adjacent H41 Sill-Pfons Gorge construction site and see the latest work progress up close. 

Here, an immersive reality show awaits to give you an all-round and up-close experience of the BBT project! 

There are two routes in the tunnel:
a shorter route, about 800 metres long
a longer route, approximately 1.1 km long

Both routes are flat and suitable for adults and children. However, as this is a construction site area, please exercise caution, wear suitable sturdy shoes and do not leave the marked areas.

If you have any further questions about the event, please email publicrelations@bbt-se.com

See you at the Open Tunnel Day!
The BBT SE team

*** SOLD OUT ***

 Unfortunately, registration is no longer possible. All available tickets have already been booked.

Please note that it is not possible to register on site at the event.

All tickets were allocated as part of a prior online registration process.