Swift Progress on the Works in the Brenner Base Tunnel 1,000-Metre mark reached on the north stretch of the exploratory tunnel, part of the Pfons-Brenner lot
Steinach am Brenner – The stretch of the exploratory tunnel in the H51 “Pfons-Brenner” lot is about 9 km long. It is being excavated by blasting.
On October 16th 2019, the 1,000-metre mark was…