03/19/2020

Brenner Base Tunnel Company (BBT SE) stops construction site operations

BBT SE is following developments in the current epidemiological emergency very closely. In order to maintain and protect the health of the people working on our construction sites and to prevent infection, work is temporarily suspended. Exceptions are the activities necessary for the safety of the partially completed works and of the construction site areas.

The measure affects both the construction sites in Austria (Tulfes-Pfons and Pfons-Brenner construction lots) and the construction sites in Italy (Muls 2-3, Isarco River Underpass, Rio Riol roadway).



BBT SE is in constant contact with the public institutions in order to implement the measures necessary to combat the coronavirus.