COMPANY DETAILS

Galleria di base del Brennero - Brenner Basistunnel BBT SE   
Societas Europeae (Europäische Gesellschaft)


Registered office
I-39100 Bolzano/Bozen, Bahnhofsplatz 1 
Tel: +39 0471 0622-10 
Fax: +39 0471 0622-11

Cod. fisc. e n. iscr. al registro ímprese Bolzano / Steuer- und Handelsregister-Nr. (Handelskammer Bozen): 02431150214  
P. IVA: IT02431150214 
UP I41J05000020005
Cap.soc. / Aktienkapital € 10.200.000,00 (i.v.) 
 

 

Branch office: FN 367729 d,  Tribunale regionale di Innsbruck / Österreichische Zweigniederlassung FN 367729 d, Landesgericht Innsbruck
A-6020 Innsbruck, Amraser Straße 8
Tel: +43 512 4030 
Fax: +43 512 4030
UID: ATU61270

PEC
bbt@pec.brennercom.net

 

 

LEGAL NOTICE

This website is used at one’s own risk only. We grant no warranty either for the permanent availability or for the accuracy, completeness or functionality of the published articles, offers and services.  Any guarantee is granted in conformity with legal regulations.  We refuse any liability for harm incurred directly or indirectly due to the usage of this website.  This website and the subsequent services are operated with great care and with the aim of providing the highest possible level of reliability and availability.  For technical reasons, however, it is not possible to provide uninterrupted services, to establish the desired connections at any and all times or to preserve stored data under any and all circumstances.  Continuous availability can therefore not be guaranteed.  IP connectivity with other network managers takes place where possible.  We refuse any liability for problems caused by third-party networks. The use of other networks is subject to the terms of use of the respective operators.  

In case of acts of nature or strikes restrictions or interruptions can arise; any such liability is hereby ruled out.  In case of linkage to other online offers we do not accept any liability due to the content, functionality and availability of the linked website(s).  This also applies to all other direct or indirect references or linkages to external internet offers.  Links to this website are acceptable, if they are external links in a separate browser window.  Placing the main window in a frame of the link placer is not allowed.  If a website linked by us should contain unlawful content we would request you to inform us so that we may remove the link immediately.

LEGAL NOTICE

All the content on this website is protected by copyright.  Text, pictures, graphics, animations and videos are subject to copyright and other protective laws.  The content may not be copied, diffused, modified or made accessible to third parties.  Any use, especially the storage in databases, as well as the duplication, distribution, adaptation and any form of commercial exploitation as well as the transmission to third parties - even in parts or as revised version -  is forbidden without the consent of the operator and/or the originator.

 

DESIGN /CONTENT/ DEVELOPMENT

Design: Anastasia Tokmyanina (BBT SE)

Content: BBT SE


Developmeent: web-crossing
Eduard-Bodem-Gasse 9
A-6020 Innsbruck
info@web-crossing.com | www.web-crossing.com

 

BRENNER BASE TUNNEL - A PROJECT UNITING EUROPE   BRENNER BASE TUNNEL   A PROJECT UNITING EUROPE - BRENNER BASE TUNNEL