New water conducts officially handed over to the municipality of Campo di Trens
On the 9th of march BBT SE CEO Dr. Ing. Raffaele Zurlo has officially handed over the new water conducts and related...
On the 9th of march BBT SE CEO Dr. Ing. Raffaele Zurlo has officially handed over the new water conducts and related...
Um den Brenner Basistunnel an den Hauptbahnhof Innsbruck anzubinden ist es notwendig, eine dreigleisige Ein- bzw....
BBT SE CEO Dr. Ing. Raffaele Zurlo has officially handed over the new areas for the disposal of recyclable materials to...
The largest construction lot for the Brenner Base Tunnel has been tendered. The tender value for the Pfons-Brenner...
Over 80% of the 9-km Tulfes/Ampass emergency tunnel has already been excavated. On December 8th, 2016 construction will...
Fire departments, local towns and BBT SE agree to provide specialized training for tunnel firefighting.