ÖBB carries out works to link the BBT to Innsbruck Central Station

Um den Brenner Basistunnel an den Hauptbahnhof Innsbruck anzubinden ist es notwendig, eine dreigleisige Ein- bzw....

New recycling facilities officially handed over to the municipality of Naz-Sciaves

BBT SE CEO Dr. Ing. Raffaele Zurlo has officially handed over the new areas for the disposal of recyclable materials to...

Construction lot worth 1.3 billion Euro has been tendered

The largest construction lot for the Brenner Base Tunnel has been tendered. The tender value for the Pfons-Brenner...

Tunnel work under the Inn valley tunnel - line to be interrupted

Over 80% of the 9-km Tulfes/Ampass emergency tunnel has already been excavated. On December 8th, 2016 construction will...

Firefighters prepare to operate in the tunnel

Fire departments, local towns and BBT SE agree to provide specialized training for tunnel firefighting.

Panoramic walking trail around the Padaster valley spoil disposal site

On Saturday, October 22nd 2016, the new walking trail in the Padaster valley (in Wolf, part of the township of Steinach...