Search query

93 results:
1. Company details  
Business name: Galleria di Base del Brennero – Brenner Basistunnel BBT SE Registered office: Piazza Stazione 1, 39100 Bolzano, Italia VAT number: IT02431150214 Codice univoco: KRRH6B9 Register...  
2. Construction site visits  
For your safety and so as not to interfere with the ongoing work, the number of visitors per group is limited.  
3. Authorization decrees  
Austrian authorization decrees UVP und teilkonzentriertes Genehmigungsverfahren / Genehmigungsbescheid Änderung der Genehmigungen 2012 Entwässerung von Kluft- und Karstwasserkörpern sowie...  
4. GIS  
GIS The Geographical Information System (GIS) which was specially developed for BBT SE provides information on the project area from Tulfes to Fortezza. You can call up these information swiftly and...  
5. Project overview  
The BBT consists of two tubes, each 8.1 m wide, running 40-70 m apart from one another. These tubes are each equipped with a single track, meaning that train traffic through the tubes is one-way....  
6. Tunnelling methods  
High-tech giants in hard rock Full face TBMs are mobile, electronically operated mills in the mountain: they pierce the rock with a rotating drilling head, remove the spoil, and, depending on the...  
7. Environment  
BBT SE endeavours to keep any impacts on nature and the environment to a minimum. Thus, the tunnel portals are carefully embedded in the landscape and the disposal sites located near the lateral...  
8. A bit of history  
In 1971 the idea of a tunnel at the Brenner was dusted off again. The UIC, the International Union of Railways, commissoned a study for a new Brenner railway with a base tunnel. By 1989 three...  
9. Construction Progress  
GENERAL INFORMATION ON THE CONSTRUCTION LOT This construction lot, worth 380 million Euro, was awarded to the...  
10. European dimension  
The Brenner Base Tunnel is the heart of the Scandinavia-Medterranean TEN Corridor from Helsinki (Finland) to La Valletta (Malta). The European Union is promoting the expansion of this transnational...