LATEST NEWS

02/21/2019
BBT SE - Round table on infrastructure projects
02/13/2019
Breakthrough in the Tulfes–Pfons section
01/14/2019
Brenner Base Tunnel: 50,000 visitors to TUNNEL WORLD
12/21/2018
CORRUPTION PREVENTION
12/07/2018
BBT: EU-COMMISSIONER VIOLETA BULC VISITS CONSTRUCTION SITES
12/05/2018
BBT: BREAKTHROUGH AT THE SOUTH PORTAL OF THE BRENNER BASE TUNNEL
BRENNER BASE TUNNEL - A PROJECT UNITING EUROPE   BRENNER BASE TUNNEL   A PROJECT UNITING EUROPE - BRENNER BASE TUNNEL