LATEST NEWS

12/15/2023
Hochstegen: after the Isarco River Underpass, another construction lot of the Brenner Base Tunnel is completed before Christmas 2023
12/13/2023
Lilia has reached her first 1000 metres excavated: she continues her journey southwards
12/12/2023
Work on the Isarco Underpass lot, the most complex of the Brenner Base Tunnel project, is completed
12/02/2023
The Flavia TBM is back in operation: in an interview, geologist Stefan Skuk talks about the geological challenges of the ‘H61 Mules’ construction lot
11/28/2023
Ida's first 1000 metres: a new milestone at the H41 Sill Gorge-Pfons site
11/20/2023
The Periadriatic Seam: a unique aspect of the BBT project
BRENNER BASE TUNNEL - A PROJECT UNITING EUROPE   BRENNER BASE TUNNEL   A PROJECT UNITING EUROPE - BRENNER BASE TUNNEL