LATEST NEWS

01/26/2023
The first parts of the Lilia Tunnel Boring Machine have reached the H41 construction site for the Sill Gorge-Pfons lot
12/21/2022
Tunnel boring machine "Lilia" for Brenner Base Tunnel accepted
12/14/2022
Lot H21 Sill Gorge: construction of the two railway bridges over the Sill river has begun
12/07/2022
BBT Environmental compensation funds: handover of the storage basin in Aica/Naz-Sciaves
11/22/2022
What does the age of dinosaurs have to do with the BBT project?
10/24/2022
BBT SE at SAIE in Bologna
BRENNER BASE TUNNEL - A PROJECT UNITING EUROPE   BRENNER BASE TUNNEL   A PROJECT UNITING EUROPE - BRENNER BASE TUNNEL