05/24/2024

Brenner Base Tunnel: engineering design services for railway equipment awarded

The contract for engineering design services for the railway outfitting of the Brenner Base Tunnel, worth approximately EUR 26.5 million, has now been signed.

BRENNER BASE TUNNEL - A PROJECT UNITING EUROPE BRENNER BASE TUNNEL - A PROJECT UNITING EUROPE BRENNER BASE TUNNEL - A PROJECT UNITING EUROPE