PHP logo

PHP Version 8.1.34

System Linux bbt 6.8.0-147-generic #147-Ubuntu SMP PREEMPT_DYNAMIC Thu Sep 24 11:33:16 UTC 2026 x86_64
Build Date Oct 21 2026 08:20:19
Build System Linux
Build Provider Ubuntu
Server API FPM/FastCGI
Virtual Directory Support disabled
Configuration File (php.ini) Path /etc/php/8.1/fpm
Loaded Configuration File /etc/php/8.1/fpm/php.ini
Scan this dir for additional .ini files /etc/php/8.1/fpm/conf.d
Additional .ini files parsed /etc/php/8.1/fpm/conf.d/10-mysqlnd.ini, /etc/php/8.1/fpm/conf.d/10-opcache.ini, /etc/php/8.1/fpm/conf.d/10-pdo.ini, /etc/php/8.1/fpm/conf.d/15-xml.ini, /etc/php/8.1/fpm/conf.d/20-apcu.ini, /etc/php/8.1/fpm/conf.d/20-bcmath.ini, /etc/php/8.1/fpm/conf.d/20-calendar.ini, /etc/php/8.1/fpm/conf.d/20-ctype.ini, /etc/php/8.1/fpm/conf.d/20-curl.ini, /etc/php/8.1/fpm/conf.d/20-dom.ini, /etc/php/8.1/fpm/conf.d/20-exif.ini, /etc/php/8.1/fpm/conf.d/20-ffi.ini, /etc/php/8.1/fpm/conf.d/20-fileinfo.ini, /etc/php/8.1/fpm/conf.d/20-ftp.ini, /etc/php/8.1/fpm/conf.d/20-gd.ini, /etc/php/8.1/fpm/conf.d/20-gettext.ini, /etc/php/8.1/fpm/conf.d/20-iconv.ini, /etc/php/8.1/fpm/conf.d/20-igbinary.ini, /etc/php/8.1/fpm/conf.d/20-imagick.ini, /etc/php/8.1/fpm/conf.d/20-imap.ini, /etc/php/8.1/fpm/conf.d/20-intl.ini, /etc/php/8.1/fpm/conf.d/20-mbstring.ini, /etc/php/8.1/fpm/conf.d/20-mcrypt.ini, /etc/php/8.1/fpm/conf.d/20-mongodb.ini, /etc/php/8.1/fpm/conf.d/20-mysqli.ini, /etc/php/8.1/fpm/conf.d/20-pdo_mysql.ini, /etc/php/8.1/fpm/conf.d/20-pdo_sqlite.ini, /etc/php/8.1/fpm/conf.d/20-phar.ini, /etc/php/8.1/fpm/conf.d/20-posix.ini, /etc/php/8.1/fpm/conf.d/20-readline.ini, /etc/php/8.1/fpm/conf.d/20-shmop.ini, /etc/php/8.1/fpm/conf.d/20-simplexml.ini, /etc/php/8.1/fpm/conf.d/20-soap.ini, /etc/php/8.1/fpm/conf.d/20-sockets.ini, /etc/php/8.1/fpm/conf.d/20-sqlite3.ini, /etc/php/8.1/fpm/conf.d/20-sysvmsg.ini, /etc/php/8.1/fpm/conf.d/20-sysvsem.ini, /etc/php/8.1/fpm/conf.d/20-sysvshm.ini, /etc/php/8.1/fpm/conf.d/20-tokenizer.ini, /etc/php/8.1/fpm/conf.d/20-xmlreader.ini, /etc/php/8.1/fpm/conf.d/20-xmlwriter.ini, /etc/php/8.1/fpm/conf.d/20-xsl.ini, /etc/php/8.1/fpm/conf.d/20-zip.ini, /etc/php/8.1/fpm/conf.d/25-redis.ini
PHP API 20210902
PHP Extension 20210902
Zend Extension 420210902
Zend Extension Build API420210902,NTS
PHP Extension Build API20210902,NTS
Debug Build no
Thread Safety disabled
Zend Signal Handling enabled
Zend Memory Manager enabled
Zend Multibyte Support provided by mbstring
Zend Max Execution Timers disabled
IPv6 Support enabled
DTrace Support available, disabled
Registered PHP Streamshttps, ftps, compress.zlib, php, file, glob, data, http, ftp, phar, zip
Registered Stream Socket Transportstcp, udp, unix, udg, ssl, tls, tlsv1.0, tlsv1.1, tlsv1.2, tlsv1.3
Registered Stream Filterszlib.*, string.rot13, string.toupper, string.tolower, convert.*, consumed, dechunk, convert.iconv.*, mcrypt.*, mdecrypt.*
Zend logo This program makes use of the Zend Scripting Language Engine:
Zend Engine v4.1.34, Copyright (c) Zend Technologies
    with Zend OPcache v8.1.34, Copyright (c), by Zend Technologies

Configuration

apcu

APCu Support Enabled
Version 5.1.28
APCu Debugging Disabled
MMAP Support Enabled
MMAP File Mask no value
Serialization Support php, igbinary
Build Date Jun 23 2026 09:27:41
DirectiveLocal ValueMaster Value
apc.coredump_unmapOffOff
apc.enable_cliOffOff
apc.enabledOnOn
apc.entries_hint00
apc.gc_ttl36003600
apc.mmap_file_maskno valueno value
apc.mmap_hugepage_size00
apc.preload_pathno valueno value
apc.serializerphpphp
apc.shm_size32M32M
apc.slam_defenseOffOff
apc.smart00
apc.ttl00
apc.use_request_timeOffOff

bcmath

BCMath support enabled
DirectiveLocal ValueMaster Value
bcmath.scale00

calendar

Calendar support enabled

cgi-fcgi

php-fpm active
DirectiveLocal ValueMaster Value
cgi.discard_pathOffOff
cgi.fix_pathinfoOnOn
cgi.force_redirectOnOn
cgi.nphOffOff
cgi.redirect_status_envno valueno value
cgi.rfc2616_headersOffOff
fastcgi.error_headerno valueno value
fastcgi.loggingOnOn
fpm.configno valueno value

Core

PHP Version 8.1.34
DirectiveLocal ValueMaster Value
allow_url_fopenOnOn
allow_url_includeOffOff
arg_separator.input&&
arg_separator.output&&
auto_append_fileno valueno value
auto_globals_jitOnOn
auto_prepend_fileno valueno value
browscapno valueno value
default_charsetUTF-8UTF-8
default_mimetypetext/htmltext/html
disable_classesno valueno value
disable_functionspcntl_alarm,pcntl_fork,pcntl_waitpid,pcntl_wait,pcntl_wifexited,pcntl_wifstopped,pcntl_wifsignaled,pcntl_wifcontinued,pcntl_wexitstatus,pcntl_wtermsig,pcntl_wstopsig,pcntl_signal,pcntl_signal_get_handler,pcntl_signal_dispatch,pcntl_get_last_error,pcntl_strerror,pcntl_sigprocmask,pcntl_sigwaitinfo,pcntl_sigtimedwait,pcntl_exec,pcntl_getpriority,pcntl_setpriority,pcntl_async_signals,pcntl_unshare,pcntl_alarm,pcntl_fork,pcntl_waitpid,pcntl_wait,pcntl_wifexited,pcntl_wifstopped,pcntl_wifsignaled,pcntl_wifcontinued,pcntl_wexitstatus,pcntl_wtermsig,pcntl_wstopsig,pcntl_signal,pcntl_signal_get_handler,pcntl_signal_dispatch,pcntl_get_last_error,pcntl_strerror,pcntl_sigprocmask,pcntl_sigwaitinfo,pcntl_sigtimedwait,pcntl_exec,pcntl_getpriority,pcntl_setpriority,pcntl_async_signals,pcntl_unshare,
display_errorsOffOff
display_startup_errorsOffOff
doc_rootno valueno value
docref_extno valueno value
docref_rootno valueno value
enable_dlOffOff
enable_post_data_readingOnOn
error_append_stringno valueno value
error_log/www/bbt2022/logs/php-error.log/www/bbt2022/logs/php-error.log
error_prepend_stringno valueno value
error_reporting2252722527
expose_phpOffOff
extension_dir/usr/lib/php/20210902/usr/lib/php/20210902
fiber.stack_sizeno valueno value
file_uploadsOnOn
hard_timeout22
highlight.comment#FF8000#FF8000
highlight.default#0000BB#0000BB
highlight.html#000000#000000
highlight.keyword#007700#007700
highlight.string#DD0000#DD0000
html_errorsOnOn
ignore_repeated_errorsOffOff
ignore_repeated_sourceOffOff
ignore_user_abortOffOff
implicit_flushOffOff
include_path.:/usr/share/php.:/usr/share/php
input_encodingno valueno value
internal_encodingno valueno value
log_errorsOnOn
mail.add_x_headerOffOff
mail.force_extra_parametersno valueno value
mail.logno valueno value
max_execution_time240240
max_file_uploads15001500
max_input_nesting_level6464
max_input_time6060
max_input_vars15001500
max_multipart_body_parts-1-1
memory_limit512M512M
open_basedir/www/bbt2022:/www/typo3shared:/usr/local/session:/usr/share/php:/tmp:/usr/bin/perl:/usr/bin/pdfinfo:/usr/bin/pdftotext/www/bbt2022:/www/typo3shared:/usr/local/session:/usr/share/php:/tmp:/usr/bin/perl:/usr/bin/pdfinfo:/usr/bin/pdftotext
output_buffering11
output_encodingno valueno value
output_handlerno valueno value
post_max_size100M100M
precision1414
realpath_cache_size4096K4096K
realpath_cache_ttl120120
register_argc_argvOffOff
report_memleaksOnOn
report_zend_debugOffOff
request_orderGPGP
sendmail_fromno valueno value
sendmail_path/usr/sbin/sendmail -t -i/usr/sbin/sendmail -t -i
serialize_precision-1-1
short_open_tagOffOff
SMTPlocalhostlocalhost
smtp_port2525
sys_temp_dirno valueno value
syslog.facilityLOG_USERLOG_USER
syslog.filterno-ctrlno-ctrl
syslog.identphpphp
unserialize_callback_funcno valueno value
upload_max_filesize100M100M
upload_tmp_dirno valueno value
user_dirno valueno value
user_ini.cache_ttl300300
user_ini.filename.user.ini.user.ini
variables_orderGPCSGPCS
xmlrpc_error_number00
xmlrpc_errorsOffOff
zend.assertions-1-1
zend.detect_unicodeOnOn
zend.enable_gcOnOn
zend.exception_ignore_argsOnOn
zend.exception_string_param_max_len00
zend.multibyteOffOff
zend.script_encodingno valueno value
zend.signal_checkOffOff

ctype

ctype functions enabled

curl

cURL support enabled
cURL Information 8.5.0
Age 10
Features
AsynchDNS Yes
CharConv No
Debug No
GSS-Negotiate No
IDN Yes
IPv6 Yes
krb4 No
Largefile Yes
libz Yes
NTLM Yes
NTLMWB No
SPNEGO Yes
SSL Yes
SSPI No
TLS-SRP Yes
HTTP2 Yes
GSSAPI Yes
KERBEROS5 Yes
UNIX_SOCKETS Yes
PSL Yes
HTTPS_PROXY Yes
MULTI_SSL No
BROTLI Yes
Protocols dict, file, ftp, ftps, gopher, gophers, http, https, imap, imaps, ldap, ldaps, mqtt, pop3, pop3s, rtmp, rtmpe, rtmps, rtmpt, rtmpte, rtmpts, rtsp, scp, sftp, smb, smbs, smtp, smtps, telnet, tftp
Host x86_64-pc-linux-gnu
SSL Version OpenSSL/3.0.13
ZLib Version 1.3
libSSH Version libssh/0.10.6/openssl/zlib
DirectiveLocal ValueMaster Value
curl.cainfono valueno value

date

date/time support enabled
timelib version 2021.19
"Olson" Timezone Database Version 0.system
Timezone Database internal
Default timezone Europe/Vienna
DirectiveLocal ValueMaster Value
date.default_latitude31.766731.7667
date.default_longitude35.233335.2333
date.sunrise_zenith90.83333390.833333
date.sunset_zenith90.83333390.833333
date.timezoneEurope/ViennaEurope/Vienna

dom

DOM/XML enabled
DOM/XML API Version 20031129
libxml Version 2.9.14
HTML Support enabled
XPath Support enabled
XPointer Support enabled
Schema Support enabled
RelaxNG Support enabled

exif

EXIF Support enabled
Supported EXIF Version 0220
Supported filetypes JPEG, TIFF
Multibyte decoding support using mbstring enabled
Extended EXIF tag formats Canon, Casio, Fujifilm, Nikon, Olympus, Samsung, Panasonic, DJI, Sony, Pentax, Minolta, Sigma, Foveon, Kyocera, Ricoh, AGFA, Epson
DirectiveLocal ValueMaster Value
exif.decode_jis_intelJISJIS
exif.decode_jis_motorolaJISJIS
exif.decode_unicode_intelUCS-2LEUCS-2LE
exif.decode_unicode_motorolaUCS-2BEUCS-2BE
exif.encode_jisno valueno value
exif.encode_unicodeISO-8859-15ISO-8859-15

FFI

FFI supportenabled
DirectiveLocal ValueMaster Value
ffi.enablepreloadpreload
ffi.preloadno valueno value

fileinfo

fileinfo support enabled
libmagic 540

filter

Input Validation and Filtering enabled
DirectiveLocal ValueMaster Value
filter.defaultunsafe_rawunsafe_raw
filter.default_flagsno valueno value

ftp

FTP support enabled
FTPS support enabled

gd

GD Support enabled
GD headers Version 2.3.3
GD library Version 2.3.3
FreeType Support enabled
FreeType Linkage with freetype
GIF Read Support enabled
GIF Create Support enabled
JPEG Support enabled
PNG Support enabled
WBMP Support enabled
XPM Support enabled
XBM Support enabled
WebP Support enabled
BMP Support enabled
AVIF Support enabled
TGA Read Support enabled
DirectiveLocal ValueMaster Value
gd.jpeg_ignore_warning11

gettext

GetText Support enabled

hash

hash support enabled
Hashing Engines md2 md4 md5 sha1 sha224 sha256 sha384 sha512/224 sha512/256 sha512 sha3-224 sha3-256 sha3-384 sha3-512 ripemd128 ripemd160 ripemd256 ripemd320 whirlpool tiger128,3 tiger160,3 tiger192,3 tiger128,4 tiger160,4 tiger192,4 snefru snefru256 gost gost-crypto adler32 crc32 crc32b crc32c fnv132 fnv1a32 fnv164 fnv1a64 joaat murmur3a murmur3c murmur3f xxh32 xxh64 xxh3 xxh128 haval128,3 haval160,3 haval192,3 haval224,3 haval256,3 haval128,4 haval160,4 haval192,4 haval224,4 haval256,4 haval128,5 haval160,5 haval192,5 haval224,5 haval256,5
MHASH support Enabled
MHASH API Version Emulated Support

iconv

iconv support enabled
iconv implementation glibc
iconv library version 2.39
DirectiveLocal ValueMaster Value
iconv.input_encodingno valueno value
iconv.internal_encodingno valueno value
iconv.output_encodingno valueno value

igbinary

igbinary support enabled
igbinary version 3.2.16
igbinary APCu serializer ABI 0
igbinary session support yes
DirectiveLocal ValueMaster Value
igbinary.compact_stringsOnOn

imagick

imagick moduleenabled
imagick module version 3.8.1
imagick classes Imagick, ImagickDraw, ImagickPixel, ImagickPixelIterator, ImagickKernel
Imagick compiled with ImageMagick version ImageMagick 6.9.12-98 Q16 x86_64 18038 https://legacy.imagemagick.org
Imagick using ImageMagick library version ImageMagick 6.9.12-98 Q16 x86_64 18038 https://legacy.imagemagick.org
ImageMagick copyright (C) 1999 ImageMagick Studio LLC
ImageMagick release date 2024-03-31
ImageMagick number of supported formats: 250
ImageMagick supported formats 3FR, 3G2, 3GP, AAI, AI, APNG, ART, ARW, AVI, AVIF, AVS, BGR, BGRA, BGRO, BIE, BMP, BMP2, BMP3, BRF, CAL, CALS, CANVAS, CAPTION, CIN, CIP, CLIP, CMYK, CMYKA, CR2, CR3, CRW, CUR, CUT, DATA, DCM, DCR, DCX, DDS, DFONT, DJVU, DNG, DOT, DPX, DXT1, DXT5, EPDF, EPI, EPS, EPS2, EPS3, EPSF, EPSI, EPT, EPT2, EPT3, ERF, EXR, FAX, FILE, FITS, FLV, FRACTAL, FTP, FTS, G3, G4, GIF, GIF87, GRADIENT, GRAY, GRAYA, GROUP4, GV, H, HALD, HDR, HEIC, HEIF, HISTOGRAM, HRZ, HTM, HTML, HTTP, HTTPS, ICB, ICO, ICON, IIQ, INFO, INLINE, IPL, ISOBRL, ISOBRL6, J2C, J2K, JBG, JBIG, JNG, JNX, JP2, JPC, JPE, JPEG, JPG, JPM, JPS, JPT, JSON, K25, KDC, LABEL, M2V, M4V, MAC, MAGICK, MAP, MASK, MAT, MATTE, MEF, MIFF, MKV, MNG, MONO, MOV, MP4, MPC, MPEG, MPG, MRW, MSL, MSVG, MTV, MVG, NEF, NRW, NULL, ORF, OTB, OTF, PAL, PALM, PAM, PANGO, PATTERN, PBM, PCD, PCDS, PCL, PCT, PCX, PDB, PDF, PDFA, PEF, PES, PFA, PFB, PFM, PGM, PGX, PICON, PICT, PIX, PJPEG, PLASMA, PNG, PNG00, PNG24, PNG32, PNG48, PNG64, PNG8, PNM, POCKETMOD, PPM, PREVIEW, PS, PS2, PS3, PSB, PSD, PTIF, PWP, RADIAL-GRADIENT, RAF, RAS, RAW, RGB, RGBA, RGBO, RGF, RLA, RLE, RMF, RW2, SCR, SCT, SFW, SGI, SHTML, SIX, SIXEL, SPARSE-COLOR, SR2, SRF, STEGANO, SUN, SVG, SVGZ, TEXT, TGA, THUMBNAIL, TIFF, TIFF64, TILE, TIM, TTC, TTF, TXT, UBRL, UBRL6, UIL, UYVY, VDA, VICAR, VID, VIDEO, VIFF, VIPS, VST, WBMP, WEBM, WEBP, WMF, WMV, WMZ, WPG, X, X3F, XBM, XC, XCF, XPM, XPS, XV, XWD, YCbCr, YCbCrA, YUV
DirectiveLocal ValueMaster Value
imagick.allow_zero_dimension_images00
imagick.locale_fix00
imagick.progress_monitor00
imagick.set_single_thread11
imagick.shutdown_sleep_count1010
imagick.skip_version_check11

imap

IMAP c-Client Version 2007f
SSL Support enabled
Kerberos Support enabled
DirectiveLocal ValueMaster Value
imap.enable_insecure_rshOffOff

intl

Internationalization supportenabled
ICU version 74.2
ICU Data version 74.2
ICU TZData version 2023c
ICU Unicode version 15.1
DirectiveLocal ValueMaster Value
intl.default_localeno valueno value
intl.error_level00
intl.use_exceptionsOffOff

json

json support enabled

libxml

libXML support active
libXML Compiled Version 2.9.14
libXML Loaded Version 20914
libXML streams enabled

mbstring

Multibyte Support enabled
Multibyte string engine libmbfl
HTTP input encoding translation disabled
libmbfl version 1.3.2
mbstring extension makes use of "streamable kanji code filter and converter", which is distributed under the GNU Lesser General Public License version 2.1.
Multibyte (japanese) regex support enabled
Multibyte regex (oniguruma) version 6.9.9
DirectiveLocal ValueMaster Value
mbstring.detect_orderno valueno value
mbstring.encoding_translationOffOff
mbstring.http_inputno valueno value
mbstring.http_outputno valueno value
mbstring.http_output_conv_mimetypes^(text/|application/xhtml\+xml)^(text/|application/xhtml\+xml)
mbstring.internal_encodingno valueno value
mbstring.languageneutralneutral
mbstring.regex_retry_limit10000001000000
mbstring.regex_stack_limit100000100000
mbstring.strict_detectionOffOff
mbstring.substitute_characterno valueno value

mcrypt

mcrypt supportenabled
mcrypt_filter supportenabled
Extension version 1.0.9
Library version 2.5.8
Api No 20021217
Supported ciphers cast-128 gost rijndael-128 twofish arcfour cast-256 loki97 rijndael-192 saferplus wake blowfish-compat des rijndael-256 serpent xtea blowfish enigma rc2 tripledes
Supported modes cbc cfb ctr ecb ncfb nofb ofb stream
DirectiveLocal ValueMaster Value
mcrypt.algorithms_dirno valueno value
mcrypt.modes_dirno valueno value

mongodb

MongoDB supportenabled
MongoDB extension version 2.5.5
MongoDB extension stability stable
libbson bundled version 2.5.6
libmongoc bundled version 2.5.6
libmongoc SSL enabled
libmongoc SSL library OpenSSL
libmongoc crypto enabled
libmongoc crypto library libcrypto
libmongoc crypto system profile disabled
libmongoc SASL enabled
libmongoc SRV enabled
libmongoc compression enabled
libmongoc compression snappy enabled
libmongoc compression zlib enabled
libmongoc compression zstd enabled
libmongocrypt bundled version 1.20.5
libmongocrypt crypto enabled
libmongocrypt crypto library libcrypto
crypt_shared library version unknown
DirectiveLocal ValueMaster Value
mongodb.debugno valueno value

mysqli

MysqlI Supportenabled
Client API library version mysqlnd 8.1.34
Active Persistent Links 0
Inactive Persistent Links 0
Active Links 0
DirectiveLocal ValueMaster Value
mysqli.allow_local_infileOffOff
mysqli.allow_persistentOffOff
mysqli.default_hostno valueno value
mysqli.default_port33063306
mysqli.default_pwno valueno value
mysqli.default_socket/var/run/mysqld/mysqld.sock/var/run/mysqld/mysqld.sock
mysqli.default_userno valueno value
mysqli.local_infile_directoryno valueno value
mysqli.max_linksUnlimitedUnlimited
mysqli.max_persistentUnlimitedUnlimited
mysqli.reconnectOffOff
mysqli.rollback_on_cached_plinkOffOff

mysqlnd

mysqlndenabled
Version mysqlnd 8.1.34
Compression supported
core SSL supported
extended SSL supported
Command buffer size 4096
Read buffer size 32768
Read timeout 86400
Collecting statistics Yes
Collecting memory statistics No
Tracing n/a
Loaded plugins mysqlnd,debug_trace,auth_plugin_mysql_native_password,auth_plugin_mysql_clear_password,auth_plugin_caching_sha2_password,auth_plugin_sha256_password
API Extensions mysqli,pdo_mysql

openssl

OpenSSL support enabled
OpenSSL Library Version OpenSSL 3.0.13 30 Jan 2024
OpenSSL Header Version OpenSSL 3.0.13 30 Jan 2024
Openssl default config /usr/lib/ssl/openssl.cnf
DirectiveLocal ValueMaster Value
openssl.cafileno valueno value
openssl.capathno valueno value

pcre

PCRE (Perl Compatible Regular Expressions) Support enabled
PCRE Library Version 10.42 2022-12-11
PCRE Unicode Version 14.0.0
PCRE JIT Support enabled
PCRE JIT Target x86 64bit (little endian + unaligned)
DirectiveLocal ValueMaster Value
pcre.backtrack_limit10000001000000
pcre.jit11
pcre.recursion_limit100000100000

PDO

PDO supportenabled
PDO drivers mysql, sqlite

pdo_mysql

PDO Driver for MySQLenabled
Client API version mysqlnd 8.1.34
DirectiveLocal ValueMaster Value
pdo_mysql.default_socket/var/run/mysqld/mysqld.sock/var/run/mysqld/mysqld.sock

pdo_sqlite

PDO Driver for SQLite 3.xenabled
SQLite Library 3.45.1

Phar

Phar: PHP Archive supportenabled
Phar API version 1.1.1
Phar-based phar archives enabled
Tar-based phar archives enabled
ZIP-based phar archives enabled
gzip compression enabled
bzip2 compression disabled (install ext/bz2)
Native OpenSSL support enabled
Phar based on pear/PHP_Archive, original concept by Davey Shafik.
Phar fully realized by Gregory Beaver and Marcus Boerger.
Portions of tar implementation Copyright (c) 2003-2009 Tim Kientzle.
DirectiveLocal ValueMaster Value
phar.cache_listno valueno value
phar.readonlyOnOn
phar.require_hashOnOn

posix

POSIX support enabled

readline

Readline Supportenabled
Readline library EditLine wrapper
DirectiveLocal ValueMaster Value
cli.pagerno valueno value
cli.prompt\b \> \b \> 

redis

Redis Supportenabled
Redis Version 6.3.0
Redis Sentinel Version 1.0
Available serializers php, json, igbinary
Available compression lzf, zstd, lz4
DirectiveLocal ValueMaster Value
redis.arrays.algorithmno valueno value
redis.arrays.authno valueno value
redis.arrays.autorehash00
redis.arrays.connecttimeout00
redis.arrays.consistent00
redis.arrays.distributorno valueno value
redis.arrays.functionsno valueno value
redis.arrays.hostsno valueno value
redis.arrays.index00
redis.arrays.lazyconnect00
redis.arrays.namesno valueno value
redis.arrays.pconnect00
redis.arrays.previousno valueno value
redis.arrays.readtimeout00
redis.arrays.retryinterval00
redis.clusters.authno valueno value
redis.clusters.cache_slots00
redis.clusters.persistent00
redis.clusters.read_timeout00
redis.clusters.seedsno valueno value
redis.clusters.timeout00
redis.pconnect.connection_limit00
redis.pconnect.echo_check_liveness11
redis.pconnect.pool_detect_dirty00
redis.pconnect.pool_patternno valueno value
redis.pconnect.pool_poll_timeout00
redis.pconnect.pooling_enabled11
redis.session.compressionnonenone
redis.session.compression_level33
redis.session.early_refresh00
redis.session.lock_expire00
redis.session.lock_failure_readonly00
redis.session.lock_retries100100
redis.session.lock_wait_time2000020000
redis.session.locking_enabled00

Reflection

Reflection enabled

session

Session Support enabled
Registered save handlers files user redis rediscluster
Registered serializer handlers php_serialize php php_binary igbinary
DirectiveLocal ValueMaster Value
session.auto_startOffOff
session.cache_expire180180
session.cache_limiternocachenocache
session.cookie_domainno valueno value
session.cookie_httponlyno valueno value
session.cookie_lifetime00
session.cookie_path//
session.cookie_samesiteno valueno value
session.cookie_secure00
session.gc_divisor10001000
session.gc_maxlifetime14401440
session.gc_probability00
session.lazy_writeOnOn
session.namePHPSESSIDPHPSESSID
session.referer_checkno valueno value
session.save_handlerfilesfiles
session.save_path/var/lib/php/sessions/var/lib/php/sessions
session.serialize_handlerphpphp
session.sid_bits_per_character55
session.sid_length2626
session.upload_progress.cleanupOnOn
session.upload_progress.enabledOnOn
session.upload_progress.freq1%1%
session.upload_progress.min_freq11
session.upload_progress.namePHP_SESSION_UPLOAD_PROGRESSPHP_SESSION_UPLOAD_PROGRESS
session.upload_progress.prefixupload_progress_upload_progress_
session.use_cookies11
session.use_only_cookies11
session.use_strict_mode00
session.use_trans_sid00

shmop

shmop support enabled

SimpleXML

SimpleXML support enabled
Schema support enabled

soap

Soap Client enabled
Soap Server enabled
DirectiveLocal ValueMaster Value
soap.wsdl_cache11
soap.wsdl_cache_dir/tmp/tmp
soap.wsdl_cache_enabledOnOn
soap.wsdl_cache_limit55
soap.wsdl_cache_ttl8640086400

sockets

Sockets Support enabled

sodium

sodium supportenabled
libsodium headers version 1.0.18
libsodium library version 1.0.18

SPL

SPL supportenabled
Interfaces OuterIterator, RecursiveIterator, SeekableIterator, SplObserver, SplSubject
Classes AppendIterator, ArrayIterator, ArrayObject, BadFunctionCallException, BadMethodCallException, CachingIterator, CallbackFilterIterator, DirectoryIterator, DomainException, EmptyIterator, FilesystemIterator, FilterIterator, GlobIterator, InfiniteIterator, InvalidArgumentException, IteratorIterator, LengthException, LimitIterator, LogicException, MultipleIterator, NoRewindIterator, OutOfBoundsException, OutOfRangeException, OverflowException, ParentIterator, RangeException, RecursiveArrayIterator, RecursiveCachingIterator, RecursiveCallbackFilterIterator, RecursiveDirectoryIterator, RecursiveFilterIterator, RecursiveIteratorIterator, RecursiveRegexIterator, RecursiveTreeIterator, RegexIterator, RuntimeException, SplDoublyLinkedList, SplFileInfo, SplFileObject, SplFixedArray, SplHeap, SplMinHeap, SplMaxHeap, SplObjectStorage, SplPriorityQueue, SplQueue, SplStack, SplTempFileObject, UnderflowException, UnexpectedValueException

sqlite3

SQLite3 supportenabled
SQLite Library 3.45.1
DirectiveLocal ValueMaster Value
sqlite3.defensiveOnOn
sqlite3.extension_dirno valueno value

standard

Dynamic Library Support enabled
Path to sendmail /usr/sbin/sendmail -t -i
DirectiveLocal ValueMaster Value
assert.activeOnOn
assert.bailOffOff
assert.callbackno valueno value
assert.exceptionOnOn
assert.warningOnOn
auto_detect_line_endingsOffOff
default_socket_timeout6060
fromno valueno value
session.trans_sid_hostsno valueno value
session.trans_sid_tagsa=href,area=href,frame=src,form=a=href,area=href,frame=src,form=
unserialize_max_depth40964096
url_rewriter.hostsno valueno value
url_rewriter.tagsform=form=
user_agentno valueno value

sysvmsg

sysvmsg support enabled

sysvsem

sysvsem support enabled

sysvshm

sysvshm support enabled

tokenizer

Tokenizer Support enabled

xml

XML Support active
XML Namespace Support active
libxml2 Version 2.9.14

xmlreader

XMLReader enabled

xmlwriter

XMLWriter enabled

xsl

XSL enabled
libxslt Version 1.1.39
libxslt compiled against libxml Version 2.9.14
EXSLT enabled
libexslt Version 0.8.21

Zend OPcache

Opcode Caching Up and Running
Optimization Enabled
SHM Cache Enabled
File Cache Disabled
JIT Disabled
Startup OK
Shared memory model mmap
Cache hits 14893294
Cache misses 2089
Used memory 75196336
Free memory 58239008
Wasted memory 782384
Interned Strings Used memory 8388608
Interned Strings Free memory 0
Cached scripts 2072
Cached keys 3675
Max keys 16229
OOM restarts 0
Hash keys restarts 0
Manual restarts 0
DirectiveLocal ValueMaster Value
opcache.blacklist_filenameno valueno value
opcache.consistency_checks00
opcache.dups_fixOffOff
opcache.enableOnOn
opcache.enable_cliOffOff
opcache.enable_file_overrideOffOff
opcache.error_logno valueno value
opcache.file_cacheno valueno value
opcache.file_cache_consistency_checksOnOn
opcache.file_cache_onlyOffOff
opcache.file_update_protection22
opcache.force_restart_timeout180180
opcache.huge_code_pagesOffOff
opcache.interned_strings_buffer88
opcache.jitno valueno value
opcache.jit_bisect_limit00
opcache.jit_blacklist_root_trace1616
opcache.jit_blacklist_side_trace88
opcache.jit_buffer_size00
opcache.jit_debug00
opcache.jit_hot_func127127
opcache.jit_hot_loop6464
opcache.jit_hot_return88
opcache.jit_hot_side_exit88
opcache.jit_max_exit_counters81928192
opcache.jit_max_loop_unrolls88
opcache.jit_max_polymorphic_calls22
opcache.jit_max_recursive_calls22
opcache.jit_max_recursive_returns22
opcache.jit_max_root_traces10241024
opcache.jit_max_side_traces128128
opcache.jit_prof_threshold0.0050.005
opcache.lockfile_path/tmp/tmp
opcache.log_verbosity_level11
opcache.max_accelerated_files1000010000
opcache.max_file_size00
opcache.max_wasted_percentage55
opcache.memory_consumption128128
opcache.opt_debug_level00
opcache.optimization_level0x7FFEBFFF0x7FFEBFFF
opcache.preferred_memory_modelno valueno value
opcache.preloadno valueno value
opcache.preload_userno valueno value
opcache.protect_memoryOffOff
opcache.record_warningsOffOff
opcache.restrict_apino valueno value
opcache.revalidate_freq22
opcache.revalidate_pathOffOff
opcache.save_commentsOnOn
opcache.use_cwdOnOn
opcache.validate_permissionOffOff
opcache.validate_rootOffOff
opcache.validate_timestampsOnOn

zip

Zip enabled
Zip version 1.19.5
Libzip version 1.7.3
BZIP2 compression Yes
XZ compression No
ZSTD compression No
AES-128 encryption Yes
AES-192 encryption Yes
AES-256 encryption Yes

zlib

ZLib Supportenabled
Stream Wrapper compress.zlib://
Stream Filter zlib.inflate, zlib.deflate
Compiled Version 1.3
Linked Version 1.3
DirectiveLocal ValueMaster Value
zlib.output_compressionOffOff
zlib.output_compression_level-1-1
zlib.output_handlerno valueno value

Additional Modules

Module Name

Environment

VariableValue
USER bbt2022
HOME /www/bbt2022/

PHP Variables

VariableValue
$_SERVER['USER']bbt2022
$_SERVER['HOME']/www/bbt2022/
$_SERVER['SCRIPT_NAME']/pdf/blaetterbuch.php
$_SERVER['REQUEST_URI']/pdf/blaetterbuch.php
$_SERVER['QUERY_STRING']no value
$_SERVER['REQUEST_METHOD']GET
$_SERVER['SERVER_PROTOCOL']HTTP/2.0
$_SERVER['GATEWAY_INTERFACE']CGI/1.1
$_SERVER['REMOTE_PORT']25186
$_SERVER['SCRIPT_FILENAME']/www/bbt2022/html/pdf/blaetterbuch.php
$_SERVER['SERVER_ADMIN'][no address given]
$_SERVER['CONTEXT_DOCUMENT_ROOT']/www/bbt2022/html
$_SERVER['CONTEXT_PREFIX']no value
$_SERVER['REQUEST_SCHEME']https
$_SERVER['DOCUMENT_ROOT']/www/bbt2022/html
$_SERVER['REMOTE_ADDR']216.73.216.67
$_SERVER['SERVER_PORT']443
$_SERVER['SERVER_ADDR']193.58.165.26
$_SERVER['SERVER_NAME']www.bbt-se.com
$_SERVER['SERVER_SOFTWARE']Apache
$_SERVER['SERVER_SIGNATURE']no value
$_SERVER['PATH']/usr/local/sbin:/usr/local/bin:/usr/sbin:/usr/bin:/snap/bin
$_SERVER['HTTP_HOST']www.bbt-se.com
$_SERVER['HTTP_ACCEPT_ENCODING']gzip, br, zstd, deflate
$_SERVER['HTTP_USER_AGENT']Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; +claudebot@anthropic.com)
$_SERVER['HTTP_ACCEPT']*/*
$_SERVER['proxy-nokeepalive']1
$_SERVER['SSL_SESSION_RESUMED']Initial
$_SERVER['SSL_SESSION_ID']341e5f96378d91f3ce4395471a5feeb3c111da02b0cd9d71114cffa9aa3fdb21
$_SERVER['SSL_SERVER_A_SIG']sha256WithRSAEncryption
$_SERVER['SSL_SERVER_A_KEY']rsaEncryption
$_SERVER['SSL_SERVER_I_DN']CN=RapidSSL TLS RSA CA G1,OU=www.digicert.com,O=DigiCert Inc,C=US
$_SERVER['SSL_SERVER_S_DN']CN=www.bbt-se.com
$_SERVER['SSL_SERVER_V_END']Mar 16 23:59:59 2027 GMT
$_SERVER['SSL_SERVER_V_START']Sep 23 00:00:00 2026 GMT
$_SERVER['SSL_SERVER_M_SERIAL']0BD8EB229458E6268802F85B2E0B4973
$_SERVER['SSL_SERVER_M_VERSION']3
$_SERVER['SSL_CLIENT_VERIFY']NONE
$_SERVER['SSL_CIPHER_ALGKEYSIZE']256
$_SERVER['SSL_CIPHER_USEKEYSIZE']256
$_SERVER['SSL_CIPHER_EXPORT']false
$_SERVER['SSL_CIPHER']TLS_AES_256_GCM_SHA384
$_SERVER['SSL_COMPRESS_METHOD']NULL
$_SERVER['SSL_SECURE_RENEG']true
$_SERVER['SSL_PROTOCOL']TLSv1.3
$_SERVER['SSL_VERSION_LIBRARY']OpenSSL/3.0.13
$_SERVER['SSL_VERSION_INTERFACE']mod_ssl/2.4.58
$_SERVER['SSL_SERVER_SAN_DNS_1']bbt-se.com
$_SERVER['SSL_SERVER_SAN_DNS_0']www.bbt-se.com
$_SERVER['SSL_SERVER_I_DN_CN']RapidSSL TLS RSA CA G1
$_SERVER['SSL_SERVER_I_DN_OU']www.digicert.com
$_SERVER['SSL_SERVER_I_DN_O']DigiCert Inc
$_SERVER['SSL_SERVER_I_DN_C']US
$_SERVER['SSL_SERVER_S_DN_CN']www.bbt-se.com
$_SERVER['SSL_TLS_SNI']www.bbt-se.com
$_SERVER['HTTPS']on
$_SERVER['H2_STREAM_TAG']3928268-21-3
$_SERVER['H2_STREAM_ID']3
$_SERVER['H2_PUSHED_ON']no value
$_SERVER['H2_PUSHED']no value
$_SERVER['H2_PUSH']off
$_SERVER['H2PUSH']off
$_SERVER['HTTP2']on
$_SERVER['CWD']/
$_SERVER['SCRIPT_URI']https://www.bbt-se.com/pdf/blaetterbuch.php
$_SERVER['SCRIPT_URL']/pdf/blaetterbuch.php
$_SERVER['FCGI_ROLE']RESPONDER
$_SERVER['PHP_SELF']/pdf/blaetterbuch.php
$_SERVER['REQUEST_TIME_FLOAT']1793207622.9171
$_SERVER['REQUEST_TIME']1793207622

PHP Credits

PHP Group
Thies C. Arntzen, Stig Bakken, Shane Caraveo, Andi Gutmans, Rasmus Lerdorf, Sam Ruby, Sascha Schumann, Zeev Suraski, Jim Winstead, Andrei Zmievski
Language Design & Concept
Andi Gutmans, Rasmus Lerdorf, Zeev Suraski, Marcus Boerger
PHP Authors
ContributionAuthors
Zend Scripting Language Engine Andi Gutmans, Zeev Suraski, Stanislav Malyshev, Marcus Boerger, Dmitry Stogov, Xinchen Hui, Nikita Popov
Extension Module API Andi Gutmans, Zeev Suraski, Andrei Zmievski
UNIX Build and Modularization Stig Bakken, Sascha Schumann, Jani Taskinen, Peter Kokot
Windows Support Shane Caraveo, Zeev Suraski, Wez Furlong, Pierre-Alain Joye, Anatol Belski, Kalle Sommer Nielsen
Server API (SAPI) Abstraction Layer Andi Gutmans, Shane Caraveo, Zeev Suraski
Streams Abstraction Layer Wez Furlong, Sara Golemon
PHP Data Objects Layer Wez Furlong, Marcus Boerger, Sterling Hughes, George Schlossnagle, Ilia Alshanetsky
Output Handler Zeev Suraski, Thies C. Arntzen, Marcus Boerger, Michael Wallner
Consistent 64 bit support Anthony Ferrara, Anatol Belski
SAPI Modules
ContributionAuthors
Apache 2.0 Handler Ian Holsman, Justin Erenkrantz (based on Apache 2.0 Filter code)
CGI / FastCGI Rasmus Lerdorf, Stig Bakken, Shane Caraveo, Dmitry Stogov
CLI Edin Kadribasic, Marcus Boerger, Johannes Schlueter, Moriyoshi Koizumi, Xinchen Hui
Embed Edin Kadribasic
FastCGI Process Manager Andrei Nigmatulin, dreamcat4, Antony Dovgal, Jerome Loyet
litespeed George Wang
phpdbg Felipe Pena, Joe Watkins, Bob Weinand
Module Authors
ModuleAuthors
BC Math Andi Gutmans
Bzip2 Sterling Hughes
Calendar Shane Caraveo, Colin Viebrock, Hartmut Holzgraefe, Wez Furlong
COM and .Net Wez Furlong
ctype Hartmut Holzgraefe
cURL Sterling Hughes
Date/Time Support Derick Rethans
DB-LIB (MS SQL, Sybase) Wez Furlong, Frank M. Kromann, Adam Baratz
DBA Sascha Schumann, Marcus Boerger
DOM Christian Stocker, Rob Richards, Marcus Boerger
enchant Pierre-Alain Joye, Ilia Alshanetsky
EXIF Rasmus Lerdorf, Marcus Boerger
FFI Dmitry Stogov
fileinfo Ilia Alshanetsky, Pierre Alain Joye, Scott MacVicar, Derick Rethans, Anatol Belski
Firebird driver for PDO Ard Biesheuvel
FTP Stefan Esser, Andrew Skalski
GD imaging Rasmus Lerdorf, Stig Bakken, Jim Winstead, Jouni Ahto, Ilia Alshanetsky, Pierre-Alain Joye, Marcus Boerger, Mark Randall
GetText Alex Plotnick
GNU GMP support Stanislav Malyshev
Iconv Rui Hirokawa, Stig Bakken, Moriyoshi Koizumi
IMAP Rex Logan, Mark Musone, Brian Wang, Kaj-Michael Lang, Antoni Pamies Olive, Rasmus Lerdorf, Andrew Skalski, Chuck Hagenbuch, Daniel R Kalowsky
Input Filter Rasmus Lerdorf, Derick Rethans, Pierre-Alain Joye, Ilia Alshanetsky
Internationalization Ed Batutis, Vladimir Iordanov, Dmitry Lakhtyuk, Stanislav Malyshev, Vadim Savchuk, Kirti Velankar
JSON Jakub Zelenka, Omar Kilani, Scott MacVicar
LDAP Amitay Isaacs, Eric Warnke, Rasmus Lerdorf, Gerrit Thomson, Stig Venaas
LIBXML Christian Stocker, Rob Richards, Marcus Boerger, Wez Furlong, Shane Caraveo
Multibyte String Functions Tsukada Takuya, Rui Hirokawa
MySQL driver for PDO George Schlossnagle, Wez Furlong, Ilia Alshanetsky, Johannes Schlueter
MySQLi Zak Greant, Georg Richter, Andrey Hristov, Ulf Wendel
MySQLnd Andrey Hristov, Ulf Wendel, Georg Richter, Johannes Schlüter
OCI8 Stig Bakken, Thies C. Arntzen, Andy Sautins, David Benson, Maxim Maletsky, Harald Radi, Antony Dovgal, Andi Gutmans, Wez Furlong, Christopher Jones, Oracle Corporation
ODBC driver for PDO Wez Furlong
ODBC Stig Bakken, Andreas Karajannis, Frank M. Kromann, Daniel R. Kalowsky
Opcache Andi Gutmans, Zeev Suraski, Stanislav Malyshev, Dmitry Stogov, Xinchen Hui
OpenSSL Stig Venaas, Wez Furlong, Sascha Kettler, Scott MacVicar, Eliot Lear
Oracle (OCI) driver for PDO Wez Furlong
pcntl Jason Greene, Arnaud Le Blanc
Perl Compatible Regexps Andrei Zmievski
PHP Archive Gregory Beaver, Marcus Boerger
PHP Data Objects Wez Furlong, Marcus Boerger, Sterling Hughes, George Schlossnagle, Ilia Alshanetsky
PHP hash Sara Golemon, Rasmus Lerdorf, Stefan Esser, Michael Wallner, Scott MacVicar
Posix Kristian Koehntopp
PostgreSQL driver for PDO Edin Kadribasic, Ilia Alshanetsky
PostgreSQL Jouni Ahto, Zeev Suraski, Yasuo Ohgaki, Chris Kings-Lynne
Pspell Vlad Krupin
Readline Thies C. Arntzen
Reflection Marcus Boerger, Timm Friebe, George Schlossnagle, Andrei Zmievski, Johannes Schlueter
Sessions Sascha Schumann, Andrei Zmievski
Shared Memory Operations Slava Poliakov, Ilia Alshanetsky
SimpleXML Sterling Hughes, Marcus Boerger, Rob Richards
SNMP Rasmus Lerdorf, Harrie Hazewinkel, Mike Jackson, Steven Lawrance, Johann Hanne, Boris Lytochkin
SOAP Brad Lafountain, Shane Caraveo, Dmitry Stogov
Sockets Chris Vandomelen, Sterling Hughes, Daniel Beulshausen, Jason Greene
Sodium Frank Denis
SPL Marcus Boerger, Etienne Kneuss
SQLite 3.x driver for PDO Wez Furlong
SQLite3 Scott MacVicar, Ilia Alshanetsky, Brad Dewar
System V Message based IPC Wez Furlong
System V Semaphores Tom May
System V Shared Memory Christian Cartus
tidy John Coggeshall, Ilia Alshanetsky
tokenizer Andrei Zmievski, Johannes Schlueter
XML Stig Bakken, Thies C. Arntzen, Sterling Hughes
XMLReader Rob Richards
XMLWriter Rob Richards, Pierre-Alain Joye
XSL Christian Stocker, Rob Richards
Zip Pierre-Alain Joye, Remi Collet
Zlib Rasmus Lerdorf, Stefan Roehrich, Zeev Suraski, Jade Nicoletti, Michael Wallner
PHP Documentation
Authors Mehdi Achour, Friedhelm Betz, Antony Dovgal, Nuno Lopes, Hannes Magnusson, Philip Olson, Georg Richter, Damien Seguy, Jakub Vrana, Adam Harvey
Editor Peter Cowburn
User Note Maintainers Daniel P. Brown, Thiago Henrique Pojda
Other Contributors Previously active authors, editors and other contributors are listed in the manual.
PHP Quality Assurance Team
Ilia Alshanetsky, Joerg Behrens, Antony Dovgal, Stefan Esser, Moriyoshi Koizumi, Magnus Maatta, Sebastian Nohn, Derick Rethans, Melvyn Sopacua, Pierre-Alain Joye, Dmitry Stogov, Felipe Pena, David Soria Parra, Stanislav Malyshev, Julien Pauli, Stephen Zarkos, Anatol Belski, Remi Collet, Ferenc Kovacs
Websites and Infrastructure team
PHP Websites Team Rasmus Lerdorf, Hannes Magnusson, Philip Olson, Lukas Kahwe Smith, Pierre-Alain Joye, Kalle Sommer Nielsen, Peter Cowburn, Adam Harvey, Ferenc Kovacs, Levi Morrison
Event Maintainers Damien Seguy, Daniel P. Brown
Network Infrastructure Daniel P. Brown
Windows Infrastructure Alex Schoenmaker
Debian Packaging
DEB.SURY.ORG, an Ondřej Surý project

PHP License

This program is free software; you can redistribute it and/or modify it under the terms of the PHP License as published by the PHP Group and included in the distribution in the file: LICENSE

This program is distributed in the hope that it will be useful, but WITHOUT ANY WARRANTY; without even the implied warranty of MERCHANTABILITY or FITNESS FOR A PARTICULAR PURPOSE.

If you did not receive a copy of the PHP license, or have any questions about PHP licensing, please contact license@php.net.