The brenner base tunnel
The construction of the Brenner railway line – seen here, the northern ramp at Patsch, around the year 1900 – was considered a mas- terful feat of technical engineering when it was opened in 1867. (Collection from the Verkehrsarchiv Tirol) THE BRENNER PASS - THE MOST IMPORTANT ALPINE PASS
Made with FlippingBook
RkJQdWJsaXNoZXIy Mjc1MzM=