The Brenner Base Tunnel - a new link through the Alps
ÖBB Infrastruktur AG (Austrian Railway Company) 50 % AUSTRIA TFB Tunnel Ferroviario del Brennero 50 % ITALY Rete Ferrovaria Italiana SpA (88,99%) Autonomous Province of Bolzano (6,38 %) Autonomous Province of Trento (4,24%) Province of Verona (0,39%) MEMBERS OF THE SUPERVISORY BOARD 6 MEMBERS (AT) 6 MEMBERS (IT) BOARD OF MANAGEMENT DIPL.-ING. MARTIN GRADNITZER (AT) DOTT. ING. GILBERTO CARDOLA (IT) APPROX. 180 COLLABORATING AUTHORS SUPERVISORY BODY 2 MEMBERS (AT) 2 MEMBERS (IT) BOLZANO BOZEN COMPANY HEADQUARTER INNSBRUCK BRANCH OFFICE AHRENTAL CONSTRUCTION SITE OFFICE WOLF/ STEINACH CONSTRUCTION SITE OFFICE FORTEZZA FRANZENSFESTE CONSTRUCTION SITE OFFICE 38 BBT SE - a “Special Vehicle” Company according to European law In 1999, the Ministers of Transport of Austria and Italy established the European Economic Interest Grouping BBT EEIG. The company was set up to plan the Brenner Base Tunnel and was the basis for the company Galleria di Base del Brennero – Brenner Basistunnel BBT SE, established on December 16th, 2004. The preparations for the establishment of the tunnel began in 2006. Actual construction began in 2007 and will be completed in 2027. The tunnel will go into operation in 2028.
Made with FlippingBook
RkJQdWJsaXNoZXIy Mjc1MzM=