CORRUPTION PREVENTION

BBT SE receives ISO 37001 certification for its integrated management system

BBT: EU-COMMISSIONER VIOLETA BULC VISITS CONSTRUCTION SITES

07.12.2018 Fortezza / Bolzano - Following the recent breakthrough of the southern portal of the Brenner Base Tunnel,...

BBT: BREAKTHROUGH AT THE SOUTH PORTAL OF THE BRENNER BASE TUNNEL

04.12.2018 Fortezza/Bolzano – The breakthrough to the southern Brenner Base Tunnel took place yesterday, only a few...

OVER 4,800 VISITORS AT THE OPEN TUNNEL DAY EVENT AND THE BBT CONSTRUCTION SITE IN ISARCO

On Sunday, September 23rd, more than 4,800 enthusiastic visitors came to the construction site of the Isarco River...

Open Tunnel Day Isarco River Underpass, September 23rd 2018

On Saturday, 23rd September BBT SE organizes the yearly Open Tunnel Day River Underpass. Also these year the Open Day...

Open Tunnel Day in the Brenner Base Tunnel: 5,300 visitors at Austria’s biggest tunnel event

For the first time ever in the BBT project area of Innsbruck, it was possible to visit the various construction stages...