|
|
|
B0051 BBT Kurzbohrungen 2009 - IT |
|
There are no translations available
Auftragnehmer:
Geotec Spa
Via G. Barbato, 20
I-86100 Campobasso
Auftragssumme netto: 1.147.370,44 EUR
|
|
 This project is cofinanced by the European Union from the budget of the Transeuropean Transport Networks (TEN-T).
Aktuelle Baustellen
The BBT tunnel system
|