Did you know …


... that 20.5 km of tunnel have already been built?

... that 27,000 m of prospection boreholes were drilled as part of the project planning?

... that 30% of the BBT will be built using blasting and 70% using a tunnel boring machine?

... that the BBT is the main element of the 2,200 km long railway axis between Berlin and Palermo?